Sr. No. | Description | Nos. | Length (in Kms) |
1 | Total In-Principle approved NHs | 69 Nos. | 4312 |
2 | DPRs to be prepared by PWD | 63 Nos. | 4031 |
3 | Letter of Acceptance issued to Consultants | 58 Nos. | 3706 |
4 | Alignment report submitted to MoRTH | 54 Nos | 3482.6 |
5 | Draft Alignment Reports submitted by the Consultants and are under scrutiny | 04 Nos | 223.5 |
6 | Tender based estimates returned unapproved by MoRTH on 18.09.2018. However ACS(PW) has requested Secretary MoRTH for reconsideration vide letter dated 20.09.2018. | 04 Nos. | 153 |
7 | Tender based estimate sent to MoRTH for approval on 19.07.2018 (Earlier entrusted with BRO) | 01 No. | 172 |
Total:- | 63 Nos. | ||
8 | DPRs being prepared by NHIDCL | 03 Nos. | 170 |
9 | Roads already constructed to NH standards by HPRIDC & case sent to MORTH for declaring these roads as NHs | 02 Nos. | 80 |
10 | Road alignment already covered in 63 Nos roads | 01 No. | 30 |
Status of DPRs of "In Principle" declared National Highways | |||
S.No. | Name of Road | Length (km) | Status |
1 | Bhota NH-103-Jahu-Kalkhal-Ner Chowk on NH-154 | 52.50 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3404-10 dated 05.09.2018. |
2 | Rohru-Tikkar-Reog Ghatti-Nera Ghatti-Bhali Dhar-Bareon-Panog-Kiari-Deori-Kotkhai on NH-705 | 80.00 | ÔÇó Draft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/5223-28 dated 15.12.2018 |
3 | Chhailla on NH-705 Sainj-Oachghat-Sarahan on NH -907A | 108.00 | ÔÇó Draft alignment report forwarded by CE(NH) to MoRTH on 08.12.2018 |
4 | Lowasa Chowki on NH-907A- Kolanvala-Budh-Majari Naryangarh. | 46.00 | Tender based estimate returned unapproved by MoRTH on 18.09.2018. However ACS(PW) has requested Secretary MoRTH for reconsideration vide letter dated 20.09.2018. |
5 | Shimla(Taradevi)-Kunihar-Ramsher-Nalagarh-Dharowala(HP)-Ghanauli on NH-205. | 102.35 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3404-10 dated 05.09.2018. |
6 | Salhech- Chandol- Habbon- Rajgarh-Baddu Sahib - Bagthan- Banethi | 127.30 | ÔÇóFeasibility study under progress ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 18.09.2018. |
7 | Dadour-Chailchowk-Janjehli-Chhatri-Ranbag-Nagan (Including Tunnel ) | 111.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
8 | Narkanda - Baghi - Ghanasidhar-Khadrala-Sungri-Rohru-Hatkoti | 40.00 | Tender based estimate returned unapproved by MoRTH on 18.09.2018. However ACS(PW) has requested Secretary MoRTH for reconsideration vide letter dated 20.09.2018. |
9 | Ghanasidhar to Tikkar | 14.00 | ÔÇó Draft Alignment Report submitted to MORT&H, New Delhi vide this office letter No: PW-CE(NH)/'In-Principle' Declared NHs/Volume-VI/6237-42 dated 30.01.2019. |
10 | Sungri-Taklech-Nogli on NH-5 | 14.00 | Tender based estimate returned unapproved by MoRTH on 18.09.2018. However ACS(PW) has requested Secretary MoRTH for reconsideration vide letter dated 20.09.2018. |
11 | Hamirpur-Sujanpur-Alampur-Palampur | 60.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH on 07.09.2018 |
12 | Basoli on NH-503 A to Biru-Thana kalan-Bangana- Nadaun on NH-3 | 65.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH on 12.10.2018 |
13 | Nadaun-Tira Sujanpur-Sandhol-Kandapattan-Jogindernagar junction with NH-154 | 127.30 | ÔÇóFeasibility study under progress ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 26.09.2018. |
14 | Mandawala on NH-105 Junction with Haryana-Barotiwalla-Patta-Kuthar-Arki-Shallaghat. | 79.40 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
15 | Shimla(Dhalli)-Tattapani-Churag-Rohanda-Sundarnagar | 180.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH on 07.09.2018 |
16 | Junction with NH-154 at Dramman- Sihunta-Chowari-Jot- Chamba-koti-Tissa-Killar. | 271.00 | ÔÇó Feasibility study under progress ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE/NH/In-Principle-2018-3221-23 dated 25.08.2018 |
17 | Sanaura(NH) - Rajgarh - Nohradhar-Haripurdhar - Rohnahat - Jamali on NH-707 | 114.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 18.09.2018. |
18 | Solan to Oachghat | 10.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 18.09.2018. |
19 | Sataun (NH-707)- Renuka-Dadahu-Jamta-Dosarka (NH-907A) | 56.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
20 | Haripurdhar-Sangrah-Renuka-Trimti-Bailya-Dholakuana | 79.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
21 | Kandaghat-Sadhupul-Chail - Kufri | 57.00 | ÔÇóFeasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3404-10 dated 05.09.2018. |
22 | Haripur Dhar-Kupavi-Tarahan-Sarahan-Chopal | 67.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3404-10 dated 05.09.2018. |
23 | Sainj (NH-705)-Deha-Chopal- Nerwa-Feduspul(NH) | 90.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
24 | Solan-Subathu-Kainchi Mor | 23.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 18.09.2018. |
25 | Kunihar to Domehar to piplughat to Dhundan to Bharirighat | 33.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 18.09.2018. |
26 | Kofota-Jakhana-Jong-Tunia-Haripur. | 29.75 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3404-10 dated 05.09.2018. |
27 | Yashwantnagar - Gaura - Dubloo - Janedghat | 38.00 | ÔÇó Draft Alignment report submitted by the Consultant and under scrutiny. |
28 | Chhalanda-Junga-Mehli | 28.00 | ÔÇó Draft Alignment report submitted by the Consultant and under scrutiny. |
29 | Patsari to Mandhol-Tahu-Throlla-Kotkhai | 61.50 | ÔÇó Draft Alignment report submitted by the Consultant and under scrutiny. |
30 | Nalagarh on NH-21A Dabhotta, Tibbi, Dugri-Pated Nawagram, Androla, Uperla, Kashmirpurm Baruna, Bagheri, Khatiwala Maura on NH-21 | 35.50 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 18.09.2018. |
31 | Rohru-Chirgaon-Tikri-Larrot-Chanshal-Dodrakawar | 96.00 | ÔÇó Draft Alignment Reports submitted by the Consultants and are under scrutiny. |
32 | Junction with NH-303 at Jawallamukhi-Dehra-Jwali-Raja-Ka-Talab-Jasure. | 90.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH on 07.09.2018 |
33 | Ghatsani-Shilha-Badhani-Bhubu Jot- Kullu | 52.40 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH on 07.09.2018 |
34 | Dharampur-Maddi-Sandhol to Gaddidhar to Tihra to Awahdevi on NH-70 (New NH-03). | 88.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3404-10 dated 05.09.2018. |
35 | Baijnath- Balada- Kandapattan-Dharmpur | 40.50 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH on 07.09.2018 |
36 | Sundernagar-Chai-Dohara-Trifalghat-Palasi. | 42.00 | ÔÇó Feasibility study under progress ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 18.09.2018. |
37 | Jogindernagar to Bareru to Dharman to Kunkatarto Kotli. | 44.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 26.09.2018. |
38 | Declaration of Palampur-Dharamsala road via Nagri road as new National Highway. | 35.70 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 26.09.2018. |
39 | Nagni-Pudwa-Panhar-Khundiyan-Jawalamukhi road. | 34.20 | ÔÇó Feasibility study under progress ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 26.09.2018. |
40 | Dhaneta-Barsar-Shahtalai-Berthin. | 61.00 | ÔÇó Final alignment report forwarded by CE(NH) to MoRTH on 19-04-2018. ÔÇó Feasibility study under progress. |
41 | Bharwain-Chintpurni-Jorbar-Pucca Tiala-Sansarpur Terrace. | 88.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH on 12.10.2018 |
42 | Ranital to Masroor Lunj ÔÇô 32 Meel via Kuther Tripal Bhater Bassa Lunsu Dhar road km 0/0 to 53/500 including bridge over Baner khad. | 54.20 | ÔÇó Feasibility study under progress ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 26.09.2018. |
43 | Kaloha-Pragpur-Dhaliara-Dada Siba Sansarpur Terrace road. | 60.90 | ÔÇó Feasibility study under progress .ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 26.09.2018. |
44 | Bhager- Panol-Berthin- Ghoridhabiri-Maharal-Bijhari-Salooni-Galore-Kangu-Lalari (Bhatha). | 71.20 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
45 | Didwin Tikkar-Mahal Bhoranj-Chandruhi Tatahar (Sarkaghat). | 28.80 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
46 | Bangana- Dhaneta- Kangu- Rangas-Balduhak- Jihan Road (Via BanganaDhaneta Tunnel) | 27.80 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH on 07.09.2018 |
47 | Santokhgarh-Tahliwal-Polian Jajon-Haroli-Saloh-Ispur-Gagret-Daulatpur-Mubarikpur-Marwari (Punjab Border) road. | 97.30 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
48 | Ajouli Santokhgarh Una Lower Lalsingi upto Swan Bridge. | 22.20 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
49 | Dadhol to Swara to Muhana to Lanjta Matiyal to Kuther road | 16.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH on 07.09.2018 |
50 | Thapna (Four lane junction)- Baghchhal (Babkhal) Marotan-Jejwin-Kalot-Bharoli kalan- Gharan Shah Talai (Including Bridge at Babkhal over Satluj River). | 42.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
51 | Darla Mod (Navgaon) to Berri road | 37.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 18.09.2018. |
52 | Bangana to Jawalaji via Shantla-Tutroo-Peer-Saluhi-Chamukha-Kaleshawar Mahadev. | 39.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
53 | Bijhari-Deotsidh ÔÇôRailly-Jajri-Bhallu Bridge-Berthin-Sunhani-Ghumarwin | 51.80 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH on 07.09.2018 |
54 | Manpul-Gauna-Basaral-Dhaneta-Tipper-Fahal-Galore-Budhawin Chowk Nalti- Hamirpur (Junction of Hamirpur Bye-Pass). | 50.50 | ÔÇó Feasibility study under progress.ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
55 | Hamirpur (Mattan Sidh) Dosarka-Lambloo Tarakwadi-Bhoranj-Jahoo. | 34.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
56 | Bassi (On Navgoan Beari Road) Jabbal- Rani Kotla-Markand (Construction of Tunnel near Bandla Dhar connecting Bilaspur) Balh Bhulana- Beri Darolan (Construction of bridge connecting Kiratpur-Ner Chowk Expressway). | 22.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
57 | Salapad to Harnoda to Kasol to Tatapani on left bank. | 64.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter dated 26.09.2018. |
58 | Sunni to Luhrion left bank | 50.00 | ÔÇó Feasibility study under progress.ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3404-10 dated 05.09.2018. |
59 | Kanchimore-Shree Naina Devi Ji-Bhakra | 50.00 | ÔÇó Feasibility study under progress. ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3320-30 dated 30.08.2018 |
60 | Pandoh to Bakhrot via Devigarh, including tunnel at Devigarh, Masogal, Khyalpuri | 81.00 | ÔÇó Feasibility study under progress ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3990-94dated 3.10.2018 |
61 | Moviseri to Rohangalu | 35.00 | ÔÇó Feasibility study under progress ÔÇóDraft alignment report forwarded by CE(NH) to MoRTH vide office letter no. - PW/CE(NH)/'In-Principle' Declared NHs/Vol-/V/3990-94dated 3.10.2018 |
62 | Tandi to Sansari Nalla (with Border Roads) | 172.00 | ÔÇó Tender Based sent to MORTH on dated 19.07.2018 |
63 | Lowasa Chowki on NH-907A Jaman ki Ser Dhangiar-Tikri-Kathar-Preet Nagar-Pinjore on NH-05 | 53.00 | Tender based estimate returned unapproved by MoRTH on 18.09.2018. However ACS(PW) has requested Secretary MoRTH for reconsideration vide letter dated 20.09.2018. |
DPR's not to be prepared by STATE PWD | |||
64 | Ranital on NH 503-Kotla on NH 154 | 39.20 | Road already constructed to NH standards by HPRIDC & case sent to MORTH for declaring these roads as NHs. |
65 | Ghumarwain-Jahu-Sarkaghat | 41.50 | Road already constructed to NH standards by HPRIDC & case sent to MORTH for declaring these roads as NHs. |
66 | Hathithan(NH-21)-Manikaran-Pulga | 43.00 | Draft DPR is being prepared by National Highway Infrastructural Development Corporation Limited. |
67 | Taklesh-Sarahan-jeori | 77.00 | Draft DPR is being prepared by National Highway Infrastructural Development Corporation Limited. |
68 | Chandigarh-Karoran-Tanda-Prempura-Gariran-Paploha-Bar-shilukhurd-Jangesh-Kasauli-Dharmpur (on NH-5) | 50.00 | Draft DPR is being prepared by National Highway Infrastructural Development Corporation Limited. |
69 | Naina Devi-Swarghat | 30.00 | Road length is common with 'in- principle' approved NH namely Kanchimore-Shree Naina Devi Ji-Bhakra road and moreover Swarghat to Kainchimore road is part of NH-205 |
TOTAL | 4311.80 |